Bring plumbing into the ADU plan early

The fixtures you see at the end of an ADU build depend on decisions made much earlier.

Illustrative stock: Ceramic basin and black faucet on a bright vanity
Illustrative stock photography

Start with the layout

Provide the intended kitchen, bathroom, and other fixture locations. These details help frame the conversation about waste, vent, and water connections.

Think about the existing property

The new unit needs to work with the broader property. Share available plans and any information about existing routes or connection points.

Coordinate the stages

Underground installation, later connections, and the rest of construction need coordination. Discuss the current project stage rather than assuming an installation timeline.

Discuss the related service